joinrefa.blogg.se

Wakeonlan specify interface
Wakeonlan specify interface







wakeonlan specify interface

Press and hold the Power button for at least five seconds to force the main power off. Servers not running ACPI-enabled operating systems will shut down to standby power mode immediately. This operation will cause any Advanced Configuration and Power Interface (ACPI) enabled operating systems to perform an orderly shutdown of the operating system. Use a stylus (or other pointed object) to press and release the Power button on the front panel. If the server does not power-on, see Troubleshoot Server Power States.Ģ.1.2 Power Off and Verify Server Is Ready for Removal From Chassisįollow these steps to ensure that the server is properly powered off and is ready for removal from chassis. The steady-on LED state indicates that the server module SP and host are both powered-on. The OK/Power LED on the server module front panel illuminates a steady-on green light. Log in to the SP ILOM CLI and type: start /SYS Log in to the ILOM web interface for the server SP and select: Remote Control -> Remote Power Control ->Power On. Use a non-conductive pointed object or stylus to press and release the recessed Power button on the server module front panel.įor Power button location, see FIGURE 1-1 Sun Blade X6270 Server Module Front Panel. To troubleshoot this issue, see Troubleshoot Server Power States.Ģ.Ěpply full power to the server SP and host. If there is not enough chassis power, the OK/Power LED will remain off until there is enough power for the server module to power on. Note - The OK/Power LED will be set to standby blink only when there is enough chassis power for the server module to power on. See FIGURE 1-1 for the OK Power LED location. A standby power state indicates that the server module SP is active but the server module host is powered-off.

wakeonlan specify interface wakeonlan specify interface

In a Standby power state, the OK power LED on the front panel of the server blinks (0.1 second on, 2.9 seconds off). Verify that the server is in a standby power state. The following procedure assumes the server module is installed in a powered-on chassis.ġ. Power Off and Verify Server Is Ready for Removal From Chassis.Refer to the following topics in this section to power on and off a server:









Wakeonlan specify interface